Cost summary for a project
GET/projects/:id/cost-summary
Returns planned vs. actual cost breakdown derived from approved time entries and cost items.
Request
Path Parameters
id uuidrequired
Resource UUID.
OK
Schema
projectIduuidrequired
Example:
7b1e2c3d-0000-0000-0000-000000000001currencystringrequired
Example:
USDplannedCoststring | nullnullablerequired
Example:
50000.00actualCoststring | nullnullablerequired
Example:
32500.00approvedCoststring | nullnullablerequired
Example:
31000.00pendingCoststring | nullnullablerequired
Example:
1500.00